What to expect with a new pool installation

Stage 1 – Site Visit & Quote

  • Initial onsite consultation to assess your space

  • Discuss pool size, shape, and positioning

  • Detailed quote provided for your project

Stage 2 – Design Selections

  • Choose your pool shape and colour

  • Select paving and fencing options

  • Add water features and extra upgrades

  • Finalise overall pool design

Stage 3 – Permits & Planning

  • Required permits and approvals organised

  • Installation schedule prepared

  • Site access and construction planning confirmed

Stage 4 – Pool Delivery Day

  • Pool shell delivered to site

  • Crane lift arranged

  • Pool shell positioned ready for installation

Stage 5 – Excavation & Site Preparation

  • Excavation completed to required depth

  • Base prepared and levelled

  • Pool shell carefully placed into position

Stage 6 – Plumbing & Backfilling

  • Plumbing connected from pool to equipment area

  • Filtration and circulation systems installed

  • Backfilling completed around the pool shell

Stage 7 – Bond Beam Installation

  • Bond beam installed around pool perimeter

  • Provides strength and support for surrounds

  • Prepares area for paving and finishing works

Stage 8 – Pool Clean Up & Chemical Balancing

  • Pool cleaned and water clarity clear

  • Water chemistry tested and balanced

  • Equipment checked and running correctly

Stage 9 – Final Handover

  • Full demonstration of pool equipment

  • Maintenance and operating guidance provided

  • Your new pool is ready to enjoy